-Construction supervision of a pedestrian and car crossing tunnel under the railway line, with a width of 28.5 m and a length of 20m
The tunnel is constructed by the hydraulic system (Box Jacking System)
-Execution of repairation and restoration works for gas works, coordinate the site around the social housing buildings for the third, fourth and fifth districts in the Sixth District - Build Your House