Description of the project

Wastewater Disposal for (Sobk Al-Dahak,Kafr Al-Khadra),Qalta Al kobra Samman, Feesha Al Soghra, Kafr Manawahla, Abu Snaita and Bahnay,Koam El Dabae, Meet Al Beida,El- Khadra) - El Bagoor - Menoufya

Gravity Networks:
*VC piplines from 12" to 24" dia. with total length 25 km. +UPVC pipelines of dia 7":10" and length 3 km
*UPVC pipelines dia 150:400 and length 1.6km
*Pressurized pipelines in Sobk Al-Dahak & Kafr El-Khadra from PE pipelines dia 200:300 mm and length 2.7 km
Pump Stations:
* Three Secondary in Sobk Al-Dahak
* Two Main in Kafr Al-Khadra . Discharge from 600:30000m3/day
* one wastwater Treatment plants in Sobk Al-Dahak & Kafr El-Khadra of discharge 6000 m3/day each
*crossings
- 2 pipe jacking crossings cultivate RC of dia 1500,1800 mm to pass DI of dia 150 :600 mm with length 72 m .
-6 open cut excavations crossing DI of dia 250:600 and length 318.4 m

Details of the project

Client :National Authority for Potable Water and Sanitary Drainage
Activity :Utilities
Location :El Bagoor - Menoufya
Project Status :In Progress