1- Design & execute the first stage of the potable water treatment plant with capacity of 23500 m3 / day. (2 clarifiers , 6 filters , 20000 m3 ground tank). 2- execute the raw water force main line from the intake to the treatment plant with dia. 700 mm , length 17 km. 3- Design & execute the intake. 4- Under crossing.